Jan Węglarz, Professor, Academiciantelephone: (48-61) 8790-790
(48-61) 665-2997
e-mail: Jan.Weglarz@cs.put.poznan.pl
Jan Węglarz, Professor (Ph.D. 1974, Dr. Habil. 1977), in years 1978-83 Associate Professor and then Professor in the Institute of Computing Science, Poznan University of Technology, full member of the Polish Academy of Sciences (PAS) since 1998 (corresponding member since 1991), Director of the Institute of Computing Science, Poznań University of Technology, and its predecessors since 1987, Director of Poznań Supercomputing and Networking Center since 1997, President of Poznań Branch of PAS 2002- 2010, President of the Committee for Computer Science of PAS since 2007, founder and Chairman of the EURO Working Group on Project Management and Scheduling, Principal Editor of the Foundations of Computing and Decision Sciences, member of several editorial boards, among others: European Journal of Operational Research, International Transactions in Operational Research. Representative of Poland in the Board of Representatives of IFORS and in EURO Council (President of EURO in years 1997-98). Member of several professional and scientific societies, among others the American Mathematical Society and the Operations Research Society of America. Major research areas: scheduling (project, machine, production), grid resource management systems, energy-aware computing.
Author and co-author of 15 monographs, 3 textbooks (3 editions each) and over 200 papers in major professional journals and conference proceedings. Frequent visitor in major research centers in Europe and in the USA. Co-laureate of the State Award (1988) and the EURO Gold Medal (1991), laureate of the Foundation for Polish Science Award (2000). Doctor h.c.: Technical University of Szczecin (2001), Academy of Mining and Metallurgy (2002), Technical University of Częstochowa (2005), Poznań University of Technology (2006), Technical University of Gdańsk (2008), University of Silesia (2009), University of Zielona Góra (2009).
1. W ę g l a r z J., Numeryczne wyznaczanie optymalnych sterowań
kompleksami operacji w zadaniu typu czas - zasoby. „Prace Instytutu Cybernetyki Technicznej Politechniki Wrocławskiej”, 1974
nr 11, seria: Studia i Materiały nr
10, s. 23-33.
2. W ę g l a r z J. , Struktura
optymalnych rozdziałów zasobu w zadaniu typu czas - zasoby. „Prace Instytutu
Cybernetyki Technicznej Politechniki Wrocławskiej”, 1974 nr 11, seria: Studia i Materiały nr 11, s. 3-12.
3. W ę g l a r z J., Zastosowanie
teorii zbiorów wypukłych w zagadnieniu wyznaczania minimalno-czasowego
sterowania kompleksami operacji. Rozprawa doktorska, Poznań, 1974.
4.
Błażewicz J. , Cellary
W. Słowiński
R. W ę g l a r z J., Original and revised simplex method for
finding time-optimal control of a complex of operations, “Foundations of Control Engineering”, 1975, vol.1, no.
1, pp. 59-71.
5.
W ę g l a r z J., Application of the convex sets theory in a
certain problem of time-optimal control of a complex of operations. ”Systems Science”, 1975, vol. 1, no. 1, pp.67-74.
6. W ę g l a r z J. O pewnej
problematyce programowania sieciowego, „Przegląd Statystyczny”, 1975 vol.
22, z. 4, s. 549-555.
7. W ę g l a r z J., Postanovka i metodika resenija
odnogo klassa problem optimalnogo
raspredelenija zadač. Materiały VI
polsko-bułgarskiego sympozjum „Zastosowania Cybernetyki w Gospodarce Narodowej”,
Zakopane, 1975, s. 68-77.
8.
Błażewicz J., Cellary
W., Słowiński
R., W ę g l a r z J., A Comparison of
two specialized versions of the revised simplex method for finding the time-optimal
control of a complex of operations. “Foundations
of Control Engineering”, 1976 vol. 2,
no. 2, pp. 103-122.
9. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Deterministyczne problemy szeregowania
zadań na równoległych procesorach. Część II - Zbiory zadań zależnych. „Podstawy
Sterowania”, 1976 vol. 6, z. 3, s. 297-320.
10. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Przykłady zastosowań maszyn cyfrowych do
sterowania procesami. Wydawnictwo Uczelniane Politechniki Poznańskiej, 1976.
11. Błażewicz J., Cellary W., W ę g l a r z J., Scheduling spittable
tasks on parallel processors to minimize schedule length. MTA SZTAKI Kozlemenyek, 17, 1976, pp. 139-147.
12. Słowiński R., W ę g l a r z J., An
algorithm for finding time-optimal task allocation in a complex of operations. “Systems
Science”, 1976 vol. 2, no. 1-2, pp. 165-174.
13. Słowiński R., W ę g l a r z J.,
Computational aspects of a certain class of time-optimal resource allocation
problems in a complex of operations. “Foundations of Control Engineering” , 1976 vol. 2, no. 2, pp. 123-133.
14. Słowiński R.,
W ę g l a r z
J., O nieliniowych systemach czaso-optymalnego
sterowania rozdziałem zadań. Materiały III Międzynarodowego Sympozjum „System - Modelowanie – Sterowanie”, Zakopane,
1976, s. 465-468.
15. Słowiński R.,
W ę g l a r z J., Systemes non-lineaires de commande en temps minimal de distribution des taches et de moyens. Actes du VIII Congres International de Cybernetique, Namur, 1976, pp.
733-743.
16. W ę g l a r z J. , Deterministyczne
problemy szeregowania zadań na równoległych procesorach. Część I - Zbiory zadań
niezależnych. „Podstawy Sterowania”, 1976
vol.6, z. 2, s. 155-178.
17. W ę g l a r z J.,
Minimalno-czasowe sterowanie rozdziałem zadań i zasobów w . kompleksie operacji w warunkach
deterministycznych. Wydawnictwo Uczelniane Politechniki Poznańskiej, seria:
Rozprawy, 1976 nr 78.
18. W ę g l a r z J., On memory
allocation strategies in multiprogramming systems. Proc. XI Yugoslav International Symposium on Information Processing ‘’Informatica 76’’, Bled 1976, pp. 1103-15.
19. W ę g l a r z J., Scheduling with
memory allocation in multiprocessing systems. In: E.Gelenbe,
H. Beilner (eds.), Modelling and Performance
Evaluation of Computer Systems. Amsterdam, North-Holland, 1976, pp. 423-424.
20. W ę g l a r z J., Time-optimal
control of resource allocation in a complex of operations framework. “IEEE Trans. Systems, Man and Cybernet”, 1976 SMC-6, no.11, pp. 783-788.
21. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Algorytmy sterowania rozdziałem zadań i
zasobów w kompleksie operacji. Wydawnictwo Uczelniane Politechniki Poznańskiej,
1977.
22. Błażewicz J.,
Cellary W., W ę g l a r z J. , A strategy for scheduling spittable tasks to reduce schedule length. “Acta Cybernetica”, 1977 vol. 3, no. 2, pp. 99-106.
23. Błażewicz J.,
Cellary W., W ę g l a r z J., Niektóre
zagadnienia rozdziału zadań i zasobów w systemach komputerowych. Prace VII Krajowej Konferencji Automatyki,
Rzeszów, 1977, t. 1, s. 903-911.
24. Błażewicz J., W ę g l a r z J., Scheduling strategies for computer control
systems in a hard-real-time environment. Proc.
I Polish-English Seminar on Real Time Process Control, Warszawa, 1977, pp. 22-37.
25. Słowiński R.,
W ę g l a r z J., Minimalno-czasowy model sieciowy z różnymi
sposobami wykonywania czynności. „Przegląd Statystyczny”, 1977 vol. 24, nr 3, s.
409-416.
26. Słowiński R.
, W ę g l a r
z J., Problemy sterowania rozdziałem
zadań i zasobów - próba syntezy. „Archiwum Automatyki i Telemechaniki”, 1977 vol.
22, z. 1-2, s. 135-145.
27. W ę g l a r z J., A single
product bounded production model with heterogeneous facilities. ”Internat. J. Production Research”, 1977 vol. 15, no. 4, pp. 399-405.
28. W ę g l a r z J., A deterministic
problem of optimal memory allocation in multiprocessing systems. Proc. II Hungarian Computer Science
Conference, Budapest, 1977, pp. 27-939.
29. W ę g l a r z J., Allocation simultanee de moyens limites discret et continu, parmi les activites dependantes. Actes du Congres
AFCET’77, t.2, Editions Hommes et Techniques,
1977, pp. 337-347.
30. Błażewicz J., Cellary W., Słowiński
R. W ę g l a r z J., An automatic
revised simplex method for constrained resource network scheduling. “ACM Trans.
On Mathematical Software” 1977 vol. 3, no. 3, pp. 295-300.
31. W ę g l a r z J., A single
product bounded production model with heterogeneous facilities. “Internat. J.
Production Research”, 1977 vol.
15, no. 4, pp. 399-405.
32. W ę g l a r z .J., Scheduling dependent tasks with memory allocation in
multiprocessing systems to minimize schedule length. In: P.P. Spies (ed.) Informatik-Fachberichte, H.9 - Modelle für Rechensysteme, Berlin, Springer
Verlag, 1977, pp. 109-119.
33. Błażewicz J.,
Cellary W, Słowiński R., W ę g l a r z J., Przykłady zastosowań maszyn cyfrowych do
sterowania procesami. Wydawnictwo Uczelniane Politechniki Poznańskiej, wyd. 2,
zm. i rozsz., 1978.
34. Błażewicz J.,
W ę g l a r z J., Deterministyczne problemy szeregowania
zadań na procesorach systemów komputerowych z uwzględnieniem dodatkowych
zasobów. „Archiwum Automatyki i Telemechaniki”, 1978 vol. 23, z. 4, s. 485-509.
35. Błażewicz J., W ę g l a r z J., Scheduling
to meet deadlines for computer control system with additional resources. Proc. II Polish-English Seminar on Real Time Process Control, Warszawa, 1978, pp. 29-39.
36. Słowiński R, W ę g l a r z J., Solving the
general project scheduling problem with multiple constrained resources by
mathematical programming. In: J. Stoer (ed.), Optimization
Techniques. LNCIS 7, part 2. Berlin, Springer Verlag, 1978, pp. 278-288.
37. W ę g l a r z J., Złożoność
obliczeniowa problemów szeregowania zadań w celu minimalizacji maksymalnego
opóźnienia. „Zeszyty Naukowe Politechniki Śląskiej”, 1978 z. 46, s. 160-167.
38. Błażewicz J, Cellary
W., Słowiński R., W ę g l a r z J., Algorytmy sterowania rozdziałem zadań i
zasobów w kompleksie operacji. Wydawnictwo Uczelniane Politechniki Poznańskiej,
wyd. 2, popr. i uzup. 1979.
39. Błażewicz J., W ę g l a r z J., Scheduling under resource constraints-achievements
and prospects. In: M. Arato, A. Butrimenko, E. Gelenbe (eds.), Performance of Computer
Systems, Wien, North-Holland, 1979, pp. 181-199.
40. W ę g l a r z J., Deterministic
scheduling with memory allocation to minimize mean flow time. Proc. 14th Yugoslav International
Symposium on Information Processing, ‘’Informatica
79’’, Bled, 1979, t.3, pp. 1-4.
41. W ę g l a r z J., New directions
in computer systems resource allocation. Proc.
IV International Symposium System - Modelling Control, Zakopane,
1979, pp. 346-351.
42. W ę g l a r z J. , New models and
procedures for resource allocation problems. Proc. VI INTERNET Congress, t. 2, Dusseldorf, VDI-Verlag Gmbh, 1979, pp. 521-530.
43. W ę g l a r z J., Project
scheduling and control in a complex - of operations framework-comparative
remarks. In: M. Pelegrin, J. Delmas
(eds.): Comparison of Automatic Control and Operational Research Techniques
Applied to Large Systems Analysis and Control, Oxford, Pergamon
Press, 1979, pp. 1-6.
44. W ę g l a r z J., Project
scheduling with discrete and continuous resources. “IEEE Trans. Systems, Man and Cybernet.”, 1979 SMC-9, no.10, pp. 644-651.
45. W ę g l a r z J., Control in resurce allocation systems. “Foundations of Control Engineering”, 1980 vol. 5, no.3, pp. 159-180.
46. W ę g l a r z J., Multiprocessor
scheduling with memory allocation - a deterministic approach. “IEEE Trans. Computers”, 1980 C-29, no.8, pp. 703-710.
47. W ę g l a r z J., On certain
models of resource allocation problems. “Kybernetes”,
1980 vol. 2, no.1, pp. 61-66.
48. W ę g l a r z J., O pewnych modelach i
metodach rozdziału zasobów różnych kategorii. Prace VIII Krajowej Konferencji
Automatyki, t.1, Rzeszów, 1980, s. 557-563.
49. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Przykłady zastosowań maszyn cyfrowych do
sterowania procesami. Wydawnictwo Uczelniane Politechniki Poznańskiej, wyd.3,
popr. 1980.
50. Błażewicz J, Cellary
W., Słowiński R., W ę g l a r z J., Algorytmy sterowania rozdziałem zadań i
zasobów w kompleksie operacji. Wydawnictwo Uczelniane Politechniki Poznańskiej,
wyd. 3, popr. 1981.
51. W ę g l a r z J., Złożoność
obliczeniowa problemów szeregowania zadań na równoległych maszynach z
uwzględnieniem dodatkowych zasobów. „Zeszyty Naukowe Politechniki Śląskiej”, 1980
z. 56, s .83-91.
52. W ę g l a r z J., Project
scheduling with continuously divisible doubly-constrained resources. “Management
Sci.”, 1981 vol. 27, no. 9, pp. 1040-1053.
53. W ę g l a r z J., Resource
allocation problems-workshop report. Proc.
IX Triennal Internat. Conf. On Operational Research
IFORS’81, Amsterdam, North-Holland, 1981, pp. 957-959.
54. W ę g l a r z J., Sterowanie w
systemach typu kompleks operacji. Warszawa, PWN, 1981.
55. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Badania operacyjne dla informatyków.
Wydawnictwo Uczelniane Politechniki Poznańskiej, wyd. 3, popr. 1982.
56. W ę g l a r z J., Modelling and
control of dynamic resource allocation project scheduling systems. In: S.G. Tzafestas (ed.) Optimisation and Control of Dynamic
Operational Research Models. Amsterdam, North-Holland, 1982, pp. 105-140.
57. W ę g l a r z J., Towards global
approaches to resource allocation in computer systems. Proc. 17th Yugoslav Internat. Symposium on Information
Processing, “Informatica’82”, Ljubljana, 1982, t. 1, pp. 1-4.
58. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Badania operacyjne dla informatyków. Warszawa, WNT, 1983.
59. Słowiński R., Urbaniak A., W ę g l a r z
J., Bicriterion capacity expansion planning of
a water supply system. “Methods of Operations
Res.”, 1983 vol. 46, pp. 733-744.
60. Słowiński R., Urbaniak A., W ę g l a r z J. , Multicriteria
capacity expansion planning of a water supply and wastewater treatment system.
In: S.G. Tzafestas, M.H. Hamza
(eds.), Advances in Modelling, Planning Decision and Control of Energy, Power
and Environmental Systems. Zurich, Acta Press, 1983,
pp. 274-278.
61. W ę g l a r z J., Mixed resource
allocation: problems and algorithms. “Foundations
of Control Engineering”, 1983 vol. 8,
no. pp. 23-31.
62. Błażewicz J.,
Cellary W., Słowiński R., W ę g l a r z J., Badania
operacyjne dla informatyków. Wydawnictwo Uczelniane Politechniki Poznańskiej,
wyd. 3, popr. 1984.
63. Błażewicz J.,
Drabowski M, W
ę g l a r z J.,
O niektórych problemach szeregowania
zadań wieloprocesorowych. „Zeszyty Naukowe Politechniki Śląskiej”, 1984 seria: Automatyka
z. 74, s. 39-48.
64. Błażewicz J.,
Drabowski M., W
ę g l a r z J.,
On the complexity of scheduling multiprocessor tasks in microprocessor
systems. “Bull. Acad. Polon.
Sci. Ser. Sci. Techn.“, 1984 vol. 32, no.9-10, pp.
591-600.
65. Brzeziński
J., Cellary W., Kręglewski J., W ę g l a r z J., Mikroprocesorowy system generacji testów,
testowania i diagnostyki płyt układów cyfrowych. Mat. Ogólnopolskiej Konf. Nauk.-Techn.
„Mikrokomputery w Automatyce i
Technice Systemów”, t.1, Wrocław,
1984, s. 177-180.
66. Brzeziński
J., Cellary W., Kręglewski J., W ę g l a r z J., Mikroprocesorowy tester płyt układów
logicznych. Mat. IX Konf.
Nauk.-Techn. Wydz. El. PP i Oddz. Pozn.
SEP, Poznań, 1984, s. 247-253.
67. Cellary W., W
ę g l a r z J.,
Koncepcja nauczania mikroinformatyki. Mat. Ogólnopolskiej Konf.
Nauk.-Techn. ‘’Mikrokomputery w Automatyce i Technice
Systemów’’ t. 3, Wrocław 1984, s. 14-24.
68. Cellary W., W
ę g l a r z J.,
Koncepcja specjalizacji ‘’Systemy mikrokomputerowe’’ na kierunku
‘’Informatyka’’. Mat. VII Ogólnopolskiego
Seminarium Metodycznego Informatyki nt. „Nauczanie informatyki wobec rozwoju mikroelektroniki” Gdańsk, 1984,
s. 26-28.
69. W ę g l a r z J., Ocena
działania systemów komputerowych - przedmiot, metody, kierunki rozwoju. Mat. Szkoły Jesiennej PTI ‘’Współczesne
kierunki rozwoju informatyki’’, Rydzyna, 1984, s. 1-25.
70. Błażewicz J., Drabowski
M, W ę g l a r z J., On the complexity of scheduling
multiprocessor tasks in microprocessor systems. “Bull. Acad. Polon. Sci. Ser. Sci. Techn.“ 1984 vol. 32, no.9-10, pp. 591-600.
71. W ę g l a r z J., Scheduling
independent activities to meet deadlines with continuous constrained resources.
“Methods of Operations Res.”, 1984
vol. 49, pp. 443-452.
72. Błażewicz J., Drabowski M., W ę g l a r z
J. , Scheduling independent 2-processor tasks to minimize schedule
length. “Information Processing Letters”, 1984 vol. 18, no. 5, pp. 267-273.
73. Błażewicz J.,
W ę g l a r
z J., Złożoność obliczeniowa problemów
szeregowania zadań na maszynach ograniczeniami zasobowymi. „Archiwum Automatyki
i Telemechaniki”, 1984 vol. 28, nr 4, s. 3-33.
74. W ę g l a r z J., Sterowanie
rozdziałem zasobów ciągłych w celu wykonania operacji przed liniami
krytycznymi. „Zeszyty Naukowe Politechniki Śląskiej”, 1984, seria: Automatyka, z. 74, s. 267-274.
75. Cellary W., W
ę g l a r z J.,
Koncepcja nauczania mikroinformatyki. „Informatyka”, 1985 vol. 20, nr 5, s. 11-21.
76. Cellary W., W
ę g l a r z J.,
Wpływ rewolucji mikroprocesorowej na kształcenie inżynierów automatyków. Prace IX Krajowej Konferencji Automatyki,
t.1, cz. 1, Łódź, 1985, s. 105-113.
77. Słowiński R., Urbaniak A., W ę g l a r z J., Multicriteria
capacity expansion planning of a water supply and wastewater treatment system. “Internat. J. Modelling and Simulation”,
1985 vol. 5, no. 4, pp. 124-127.
78. Słowiński R.,
Urbaniak A., W ę g l a r z J., Wybór strategii rozwoju systemu
zaopatrzenia w wodę i ochrony wód w warunkach niepewności. „Zeszyty Naukowe Politechniki Śląskiej”, 1985, seria: Automatyka, z. 79, s. 63-74.
79. Słowiński R., W ę g l a r z J., An
interactive algorithm for multiobjective precedence
and resource constrained scheduling problems. Proc. 8 World Congress
on Project Management INTERNET’85, Amsterdam, North-Holland, 1985, pp. 866-873.
80. W ę g l a r z J., Allocation
continuous, doubly constrained resources among parallel production activities
to meet deadlines. “R.A.I.R.O.”, 1985 APII 19, pp .497-507.
81. Błażewicz J., Drabowski
M. , Ecker K., W ę g l a r z J., Multiprocessor task scheduling with
single resource constraints. In: Y. Allidina (ed.)
Parallel Processing Techniques, New York, Plenum Publ. Corp., 1986, pp. 260-266.
82. Błażewicz J., Drabowski M., W ę g l a r z J., Scheduling multiprocessor tasks to
minimize schedule length. “IEEE Trans.
Computers”, 1986, vol. C-35, no. 5,
pp. 389-393.
83. Błażewicz J., Cellary W., Słowiński
R., W ę g l a r z J., Scheduling Under
Resource Constraints-Deterministic Models, Basel, J.C. Baltzer
AG, 1986.
84. Słowiński R., Urbaniak A., W ę g l a r z J., Probabilistic and fuzzy approach to
capacity expansion planning of a water supply system. Proc. IFAC Conference on Systems Analysis Applied to Water and Related
Land Resources. Oxford, Pergamon Press, 1986, pp.
93-98.
85. W ę g l a r z J., Control of
resource allocation in a complex of independent operations with due-dates. Proc. V Internat. Symp. System-Modelling-Control, 1986 pp. 153-159.
86. W ę g l a r z J., On some design
problems of multiprocessor systems in hard-real-time environment. Proc. Polish-English Seminar on Real Time
Process Control, 1986, pp. 1-12.
87. W ę g l a r z J., On some multicriteria resource allocation problems under continuous
processing speed vs. resource amount functions. In: R.L. Keeney, R.H. Mohring, H. Otway,F.J. Radermacher, M.M.Richter, (eds.),
Multi-Attribute Decision Making via OR-Based Expert Systems, Universitat Passau, 1986, pp. 359-366.
88. W ę g l a r z J., Elastyczne
systemy produkcyjne - zarys problematyki od strony badań operacyjnych. Mat. III Szkoły Inżynierii Systemów, Komitet
Budowy Maszyn PAN, Kiekrz, 1987, s. 77-86.
89. W ę g l a r z J., Secuenciacion de proyectos mediante modelos dinamicos de actividad-ideas principales y logros. “Ingenieria Industrial”,1987 vol. 6, no. 2, pp. 91-104.
90. W ę g l a r z J a n, Multiciteria scheduling of dynamic production activities. “Engineering Costs and Production Economics”, 1988 vol. 14,
pp. 19-24.
91. W ę g l a r z J.,
Wielokryterialne problemy rozdziału zasobów ciągłych w kompleksie operacji
niezależnych. „Zeszyty Naukowe Politechniki Śląskiej”, 1988, seria: Automatyka, z. 94, s. 351-362.
92. Patterson J.H., Słowiński R. Talbot F.B., W ę
g l a r z J., An algorithm for a general
class of precedence and resource-constrained scheduling problems. In: R. Słowiński, J. Węglarz (eds.),
Advances in Project Scheduling, Amsterdam, Elsevier, 1989, pp. 3-29.
93. Słowiński R., W ę g l a r z J. (eds.),
Advances in Project Scheduling. Amsterdam, Elsevier, 1989. ISBN 0-444-87358-9.
94. W ę g l a r z J., Deadline
scheduling of independent jobs under continuous processing speed-resource
amount functions. “Bull. Acad. Polon. Sci. Ser. Sci. Techn.“ , 1989
vol. 37, no. 1-2, pp. 113-119.
95. W ę g l a r z J., Project
scheduling under continuous processing speed vs. resource amount functions. In:
R. Słowiński, J. Węglarz
(eds.), Advances in Project Scheduling, Amsterdam, Elsevier, 1989, pp. 273-277.
ISBN 0-444-87358-9.
96. W ę g l a r z J., Time-optimal
resource allocation under stepwise consumption constraints. Ecole
Polytechnique Federale de
Lausanne, Dept. De Mathematiques, ORWP 89/14, June 1989, pp. 1-13.
97. Błażewicz J.,
W ę g l a r z
J., O pewnym problemie szeregowania maszyn i wózków w elastycznym
systemie produkcyjnym. „Zeszyty
Naukowe Politechniki Śląskiej”,1990,
seria: Automatyka. z. 101, s. 35-44.
98. Patterson H., Talbot F.B., Słowiński R., W ę g
l a r z J., Computational experience
with a backtracking algorithm for solving a genarl class of precedence and resource -
constrained scheduling problems. “Europ. J. Opnl. Res.”, 1990 vol. 49, no.1, pp. 68-80.
99. Słowiński R.,
Soniewicki B., W ę g l a r
z J., Algorytmy priorytetowe i algorytmy
symulowanej relaksacji dla problemów rozdziału zasobów. „Zeszyty Naukowe Politechniki Śląskiej”, 1990, seria: Automatyka, z.100, s. 301-309.
100.
Słowiński R., Soniewicki
B., W ę g l a r z J., MPS - decision
support system for multiobjective project scheduling.
In: Collaborative Paper CP-90-008, IIASA, Laxenburg, 1990, pp. 336-364.
101.
Valadares Tavares L., W ę g l a r z J. (eds.),
Project Management and Scheduling. Special issue of “Europ. J. Opnl. Res.”, 1990 vol. 49, no.1, pp. 154.
102.
W ę g l a r z J., Multicriteria
scheduling under continuous, doubly constrained resources. “Methods of
Operations Research “, 1990 vol. 60, pp. 153-162.
103.
W ę g l a r z J., Project scheduling under dynamic activity
models. In: V. D’Amato, C.Maccheroni (eds.), Dynamics
of Complex Systems, Milano, 1990, pp. 165-173.
104.
Błażewicz J., Finke G., Laporte
G., W ę g l a r z J., Dynamic
programming algorithm for a FMS scheduling problem. “Bull. Acad. Polon. Sci. Ser. Sci. Tech.”, 1990 vol. 39, no.2, pp. 345-350.
105.
Błażewicz J., Dror M., W
ę g l a r z J a n, Mathematical programming formulation for
machine scheduling (Invited review). “Europ. J. Opnl. Res.”, 1991 vol. 51, no. 3, pp. 283-300.
106. Błażewicz J., Finke G., Laporte G., W ę g l a r z
J., Scheduling tasks and vehicles in a flexible manufacturing system. “Internat. J. of Flexible
Manufacturing System”, 1991 vol. 3, no.
3, pp. 819-831.
107.
Słowiński R., Soniewicki B, W ę g l a r z J., MPS -
komputerowy system wspomagania decyzji dla wielokryterialnego rozdziału
zasobów. „Archiwum Automatyki i Telemechaniki”, 1991 vol. 36,
nr 1, s. 3-18.
108.
W ę g l a r z J., Synthesis problems in allocating
continuous, doubly constrained resources. Proc.
XI Triennal Internat. Conf. on Operational Research IFORS’90, Oxford, Pergamon Press, 1991, pp. 715-724.
109.
Błażewicz J., Ecker K., Schmidt
G., W ę g l a r z J., Scheduling in Computer
and Manufacturing Systems. Berlin, Springer Verlag, 1992.
110. Błażewicz J., Drozdowski M., W ę g l a r z J., Szeregowanie zadań wieloprocesorowych przed liniami krytycznymi.
„Zeszyty Naukowe Politechniki Śląskiej”, 1992, seria: Automatyka, z.109, s. 11-19.
111. W ę g l a r z J., On relation
between some nonpreemptive, parallel machine
scheduling problems. “ Bull. Acad. Polon. Sci. Ser. Tech.”, 1992 vol. 40,
no. 4, pp. 411-416.
112. W ę g l a r z J., O pewnych
dyskretno-ciągłych problemach
szeregowania, „Zeszyty Naukowe Politechniki Śląskiej”,1992, seria:
Automatyka, z.109, s. 311-319.
113.
Błażewicz J., Drozdowski M., W ę g
l a r z J., Scheduling multiprocessor
tasks - a survey. “Internat. J. Microcomp.
Applications” ,1993 vol. 13, no. 2, p .89-97.
114.
Józefowska J., W ę g l a r z
J., Approximation algorithms for
some discrete-continuous scheduling problems. “Bull. Acad. Polon.
Sci. Ser. Tech. Sci.”, 1993 vol. 41,
no.4, pp. 391-399.
115.
Nabrzyski J., W ę g l a r z J., On a knowledge-based systems for multiobjective project scheduling. Proc. 4th Intenat. Congress on
Industrial Eng., Marsylia,
1993, pp. 131-139.
116. Błażewicz J.,
Drozdowski M., W ę g l a r z J., Szeregowanie zadań wieloprocesorowych na
alternatywnych zbiorach procesorów dedykowanych. „Zeszyty Naukowe
Politechniki Śląskiej”,1994, seria: Automatyka, z. 14, s. 13-25.
117.
Błażewicz J., Ecker K., Schmidt
G., W ę g l a r z J., Scheduling in
Computer and Manufacturing Systems, wyd. 2 popr i uzup., Berlin, Springer Verlag, 1994. ISBN
3-540-55958-2.
118.
Błażewicz J., Drozdowski
M., W ę g l a r z J. , Scheduling
multiprocessor tasks - a survey.”Internat. J. of Microcomp.
Applications”, 1994 vol. 13, no. 2, p. 89-97.
119.
Błażewicz J., W ę g l a r z
J., Scheduling in computer and manufacturing systems - new trends. EURO XIII Tutorial and Research Review-Paper,
Univ. Of Strathclyde, Glasgow, 1994, pp. 69-91.
120. Hofmokl T., W ę g l
a r z J., Wierzbicki
A., Miejskie sieci komputerowe w infrastrukturze informatycznej nauki w Polsce.
W: Miejskie Sieci Komputerowe w Nauce i Gospodarce POLMAN’94, Ośrodek
Wydawnictw Naukowych PAN, Poznań, 1994, s. 7-16.
121. Hofmokl T., W ę g l a r z J., Wierzbicki A., Miejskie sieci komputerowe
w infrastrukturze informatycznej nauki w Polsce. „Informatyka”, 1994, nr 10, s. 5-8.
122. Józefowska
J., Piesik P., W ę g l a r z J., Modelowanie
i weryfikacja decyzji projektowych i operacyjnych w elastycznych systemach
produkcyjnych za pomocą programu symulacyjnego RUNSIM. „Zeszyty Naukowe
Politechniki Śląskiej”,1994, seria: Automatyka z.114, s. 123-133.
123.
Józefowska J., Piesik P., W
ę g l a r z J., RUNSIM - a tool for simulation of flexible
manufacturing systems. In: R. Trappl, Cybernetics and Systems. vol.2, World Scientific,1994, pp. 1237-1244.
124.
Józefowska J., Piesik P., W ę g l a r z
J., Scheduling flexible manufacturing systems with RUNSIM. Proc. Of the CAPE 10 Internat. Conf., Palermo, 1994, pp. 555-559.
125. Nabrzyski J.,
W ę g l a r z
J., Koncepcja Szkieletowego Systemu eksperckiego dla problemów rozdziału
zasobów. ”Zeszyty Naukowe Politechniki Śląskiej”, 1994, seria: Automatyka z.115,
s. 347-358. .
126. Rychlewski
J., Stroiński M., W ę g l a r z J., Poznańskie Centrum Komputerowo-Sieciowe. „Nauka”,
Wydawn. PAN, 1994, nr 4, s. 141-150.
127. Słowiński R., Soniewicki
B., W ę g l a r z J., DSS for multiobjective project scheduling.”Europ.
J.
of Opnl. Res.”, 1994 vol. 79, no. 2, pp.
220-229.
128. W ę g l a r z J.,
Infrastruktura informatyczna nauki - główne kierunki rozwoju. W: Konf. Informatyka na Wyższych Uczelniach dla Gospodarki
Narodowej, Gdańsk, 1994 t. 2, s. 147-148.
129. Błażewicz J.,
W ę g l a r
z J., O pewnych nowych kierunkach w
teorii szeregowania. W: Poznańska Szkoła Matematyczna: materiały Sesji Naukowej
Uniwersytetu w Poznaniu, Z. Palka (red.), Poznań, Wydawn.
UAM, 1995, s. 9-23.
130.
Józefowska J., Różycki R.,
W ę g l a r z J., A genetic algorithm for discrete-continuous
scheduling problems. In: Artificial Neural Nets and Genetic Algorithms, Wien, Springer
Verlag, 1995, pp. 273-276. ISBN 3-211-86692-0.
131.
Nabrzyski J., W ę g l a r z
J., On an expert system with tabu search for multiobjective project scheduling. Proc. ETFA’95 Conference, 1995 vol.3, s. 87-94.
132.
Piesik P., W ę g l a r z
J., Interactive decision support for flexible manufacturing systems
using simulation techniques. In: Proc.
ETFA’95 Conference, 1995 vol.3, pp. 341-348.
133. Rychlewski
J., Stroiński M., W ę g l a r z J., Poznańskie Centrum
Superkomputerowo-Sieciowe: organizacja, zasoby, kierunki badawcze. W: XI
Konferencja Przetwarzanie i Przesyłanie Energii i Informacji, Poznań, 18-19
maja 1995, Poznań, SEP, 1995, s. 9-12.
134. Stroiński M.,
W ę g l a r
z J., Metaprzetwarzanie
- stan aktualny i perspektywy. Mat. II
Krajowej Konferencji Komputerowe Wspomaganie Badań Naukowych, Wrocław,
1995, s. 13-27.
135. Stroiński
M., W ę g l a r
z J., Miejskie sieci komputerowe w
realizacji wizji społeczeństwa informatycznego. ”Informatyka”, 1995 nr 6, s. 5-8,
136. W ę g l a r z, J a n, Dyskretno-ciągłe
problemy szeregowania - metodyka rozwiązywania. „Zeszyty Naukowe Politechniki
Śląskiej”,1995, seria: Automatyka z. 116, s. 79-89.
137.
Błażewicz J., Drozdowski
M., Werra de D., W ę g l a r z
J., Deadline scheduling of multiprocessor tasks, “Discrete Applied Mathematics”, 1996 vol. 65, pp. 81-95.
138.
Błażewicz J., Ecker K., Pesch E., Schmidt G., W ę g l a r z
J., Scheduling Computer and Manufacturing Processes, Berlin, Springer Verlag, 1996. ISBN 3-540-61496-6.
139.
Błażewicz J., Ecker K., W ę g l a r z
J. (eds.), Scheduling computing and manufacturing processes, ”Europ. J. Opnl. Res.”,1996 vol.
83, no.2, pp. 180.
140.
Błażewicz J., Kasprzak
M., Sterna M., W ę g l a r z J.,
Selected combinatorial optimization problems arising in molecular biology, “Ricerca Operativa”, 1996
no. 80, pp. 35-63.
141.
Błażewicz J., Kaczmarek J., Kasprzak M., W ę g l
a r z J., Sequential and parallel
algorithms for DNA sequencing, “Computational Methods in Science and Technology”,
1996 no.1, pp. 31-42.
142.
Józefowska J., Mika M., Różycki R., Waligóra G., W ę g l
a r z J., Local search metaheuristics for discrete-continuous scheduling problems.
Proc. 5th International
Workshop on Project Management and Scheduling PMS’96, Poznań
1996, pp. 131-134.
143.
Józefowska J., Mika M., W ę g l a r z
J., A simulated annealing algorithm for some class of
discrete-continuous scheduling problems, “Computational Methods in Science and
Technology”, 1996 no. 2, pp. 73-85,
144.
Józefowska J., Waligóra
G., W ę g l a r z J., A tabu search
algorithm for some discrete - continuouse scheduling
problems, chapter 10, In: V.J. Rayward-Smith, I.H. Osman, C.V. Reeves, G.D. Smith, Modern Heuristic Search Methods,
J. Wiley and Sons, 1996, pp. 167-181. ISBN 0-471-96280-5.
145.
Józefowska J., W ę g l a r z J., Discrete-continuous scheduling
problems-mean completion time results, “Europ. J. Opnl. Res.”,1996 vol.99
no. 2, pp. 302-310.
146.
Józefowska J., W ę g l a r z J., Minimzation of
mean flow time for some
discrete-continuous scheduling problems, “Bull. Acad.Polon.
Sci. Ser. Techn. Sci.”, 1996 no. 2,
pp. 213-218.
147.
Nabrzyski J., Stroiński M., W ę g l a r z
J. , Metacomputing at Poznań
Supercomputing and Networking Center. Proc. European School on Parallel
Programming Environment, Grenoble, 1996, pp. 27-35.
148.
Nabrzyski J., M. Stroiński,
W ę g l a r z J., Metacomputing
at Poznań Supercomputing and Networking Center, Proc.
Parallel Programming Environments for
High Performance Computing, Alpe d’Huez, 1996, s. 181-184.
149.
Nabrzyski J., W ę g l a r z
J., On an expert system with tabu search for multiobjective project scheduling, chapter 3, In: E. Levner, Intelligent Scheduling of Robots and Flexible
Manufacturing Systems, CTEH Press., Holon, 1996, pp. 43-57.
150. Nabrzyski J.,
W ę g l a r
z J., System ekspercki z wielokryterialnym algorytmem Tabu dla
problemów rozdziału zasobów. „Zeszyty Naukowe Politechniki Śląskiej”,1996, seria:
Automatyka z.117, s. 237-246.
151. Piesik P., W ę g l a r z J., Wielokryterialne wspomaganie
projektowania elastycznych systemów produkcyjnych z wykorzystaniem technik
symulacyjnych. „Zeszyty Naukowe Politechniki Śląskiej”, 1996, seria: Automatyka
z. 117, s. 53-61.
152. Rychlewski
J.,. Stroiński M., W ę g l a r z, J., Wojciechowski K., Główne kierunki badań w
zakresie nauk obliczeniowych w środowisku poznańskim. Mat. Konferencji
INFOFESTIWAL, Kraków 1996.
153. Stroiński M.,
W ę g l a r
z J., Problemy rozwoju sieci
komputerowych z perspektywy globalnej infrastruktury informacyjnej. W: Miejskie
Sieci Komputerowe w Nauce, Gospodarce i Administracji POLMAN’96, Poznań,
Ośrodek Wydawnictw Naukowych PAN, 1996, s. 9-16.
154.
Błażewicz J., Kaczmarek J., Kasprzak M., Markiewicz W., W ę g l a r z J., Sequential and parallel algorithms for DNA - sequencing. „Computer
Applications in the Biosciences”, CABIOS 13, 1997, no. 2, pp. 151-158.
155.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., Discrete-continuous scheduling to
minimize maximum lateness. Proc. Methods
and Models in Automation and Robotics MMAR’97, 1997, pp. 947-952.
156.
Józefowska, Mika M., Różycki
R., Waligóra G., W ę g l a r z J., Discrete-continuous scheduling to
minimize the mean flow time - computational experiments, “Computational Methods
in Science and Technology”, 1997 no. 3, pp. 25-37.
157.
Józefowska J., Mika M., Różycki R.,
Waligóra G., W
ę g l a r z J., Discrete-continuous
scheduling with identical processing rates of jobs, “Foundations of Computing and
Decision Sciences”, 1997 vol.22, no. 4, pp. 279-295.
158.
Nabrzyski J., W ę g l a r z
J., Expert systems with multicriteria TS
algorithm for multicriteria project scheduling, Proc. 6th IEEE International
Conference on Emerging Technologies and Factory Automation, Los Angeles,
1997, pp. 161-166.
159.
Nabrzyski J. W ę g l a r z, J., On an expert system
with multicriteria tabu
search for multiobjective project scheduling, Proc. 6th IEEE International
Conference on Emerging Technologies and Factory Automation, Los Angeles,
1997, pp. 287-291.
160. Nakonieczny
M., Starzak S., Stroiński M., W ę g l a r z J., Naukowa krajowa sieć ATM POL-34,
Zielonogórska Sieć Komputerowa w Nauce i Gospodarce Regionu, Zielona Góra,
1997.
161.
Piesik P., W ę g l a r z J., Multicriteria
decision support for flexible manufacturing systems using an interactive
method. Proc. Methods and Models in
Automation and Robotics MMAR’97, 1997, pp. 1095-1099.
162. Stroiński M.,
W ę g l a r
z J., Rozwój technik komunikacyjnych. W:
Sieci Komputerowe w Nauce, Gospodarce i Administracji POLMAN’97, Poznań,
Ośrodek Wydawnictw Naukowych PAN, 1997, s. 363-367.
163. Błażewicz J., Józefowska J., W ę g l a r z J., Informatik in Modernen
Fertigungssystemen, Konferenz Ausbildung in Richtung Hochtechnologien, Wydawn. Pol.Pozn., 1998, s. 45-47.
164.
Błażewicz J., W ę g l a r z J., Recent advances in processor scheduling
theory, Proc. XXIst
National Conference on Circuit Theory and Electronic Networks, Poznań-Kiekrz, 1998, pp. 45-60.
165.
Józefowska J., W ę g l a r z J., On a methodology for discrete-continuous
scheduling problems, ”Europ. J. Opnl.
Res.”, 1998 vol.107, no. 2, pp. 338-353.
166.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., Local search methaheuristics
for discrete-continuous scheduling problems, “Europ.
J. Opnl. Res.”, 1998 vol. 107, no. 2, pp. 354-370.
167.
Józefowska J., Mika M., Różycki R., Waligóra G., W ę g l a r z
J., On discrete-continuous project scheduling, Proc. Of the 6th Internat. Workshop on Project Management
and Scheduling PMS’98, Stambuł 7-9-07. 1998, pp. 72-75.
168.
Józefowska J., Mika M., Różycki
M., Waligóra G., W ę g l a r z J., Scheduling precedence constrained nonpreemptable jobs on parallel machines with additional
discrete-continuous resources, Proc.
MMAR’98, 5th International Symposium on Methods and Models in
Automation and Robotics, 1998, pp. 1041-1046.
169.
Józefowska J., Waligóra
G., W ę g l a r z J., Tabu search with the cancellation sequence method for a
class of discrete-continuous scheduling problems, Proc. MMAR’98, 5th International Symposium on Methods and
Models in Automation and Robotics, 1998, pp. 1047-1052.
170. Józefowska
J., Mika M., Różycki R., Waligóra G., W
ę g l a r z J.,
Minimalizacja maksymalnego opóźnienia w dyskretno-ciągłych problemach
szeregowania przy użyciu metody podziału i ograniczeń, „Zeszyty Naukowe
Politechniki Śląskiej”, 1998, seria: Automatyka, z. 123, s. 221-232.
171. Józefowska
J., Mika M., Różycki R., Waligóra G., W ę g l a r z J.,
Optymalizacja przydziału zasobów ciągłych i dyskretnych w kompleksie operacji
niepodzielnych, „Zeszyty Naukowe Politechniki Śląskiej”, 1998, seria: Automatyka, z.
123, s. 233-248.
172.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., On discrete-continuous project scheduling, Proc. Sixth International Workshop on Project Management and
Scheduling, Istanbul, 1998, pp. 72-75.
173. Nakonieczny
M., Starzak S., Stroiński M., W ę g l a r z J., Krajowa szerokopasmowa sieć naukowa ATM,
W: Miejskie Sieci Komputerowe w Nauce, Gospodarce i Administracji, POLMAN’98,
Poznań, Ośrodek Wydawnictw Naukowych, 1998, s. 638-653.
174.
Nakonieczny M., Starzak S., Stroiński M., W ę g l a r z
J., Polish scientific broadband network, “Computer Networks and ISDN
Systems”, 1998 vol. 30, pp. 1669-1676.
175. Stroiński M.,
W ę g l a r z
J., Rozwój i wymagania zastosowań infrastruktury informatycznej nauki, W:
Miejskie Sieci Komputerowe w Nauce, Gospodarce i Administracji, POLMAN’98,
Poznań, Ośrodek Wydawnictw Naukowych, 1998, s.15-30.
176. W ę g l a r z J a n,
Informatyka jako dyscyplina a wizja społeczeństwa informacyjnego, „ProDialog”, 1998 vol.
7, s. 1-10.
177. W ę g l a r z J., O
dyskretno-ciągłych problemach sterowania w kompleksie operacji. W: Problemy
Automatyki i Informatyki, Wrocław, Ossolineum, 1998, s. 153-161.
178.
Błażewicz J., Formanowicz P., Kasprzak M., W ę g l
a r z J., DNA sequencing with positive
and negative errors, “Journal of Computational Biology”, 1999 no. 6, pp. 113-123.
179.
Józefowska J., Mika M., Różycki R., Waligóra G., W ę g l a r z
J., Discrete-contiuous scheduling to minimize makespan for power processing rates of jobs, “Discrete
Applied Mathematics”, 1999 no. 94, pp.
263-285.
180.
Józefowska J., Waligóra
G., W ę g l a r z J., Parallel tabu search algorithms for scheduling independent jobs on
parallel machines to minimize makespan, “Foundations
of Computing and Decision Sciences”, 1999 vol.24, no. 3, pp. 119-140.
181.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z
J., Project scheduling under discrete and continuous resources. Chapter
13. In: J.Węglarz (ed.), Project Scheduling: Recent
Models, Algorithms and Applications. Boston,
Kluwer, 1999, pp. 289-308. ISBN 0-792-38268-4.
182.
Nabrzyski J., Stroiński M.,
W ę g l a r z J., Networking Aspects of Distributed
Computing, In: J. Błażewicz, K. Ecker,
D.Trystram (eds.), Parallel and Distributed Computing.
Springer Verlag 1999, pp. 410-463.
183. Nabrzyski J., W ę g l a r z J., Knowledge-based multiobjective
project scheduling problems. Chapter
184. Nakonieczny
M., Starzak S., Stroiński M., W ę g l a r z J. , Sieć POL34/155 a infrastruktura sieciowa
XXI w. W: Miejskie Sieci Komputerowe w Nauce, Gospodarce i Administracji,
POLMAN’99. Poznań, Ośrodek Wydawnictw Naukowych, 1999, s. 3-36.
185.
Piesik P., W ę g l a r z J., Multicriteria decision support for FMS using an interactive method, Proc. 7th
IEEE International Conference on Emerging Technologies and Factory
Automation, Barcelona, 1999, vol.1, pp. 733-734.
186. Rychlewski
J., Stroiński M., W ę g l a r z J., Rozwój badań
i usług w zakresie KDM w Poznańskim Centrum Superkomputerowo-Sieciowym. W: Miejskie
Sieci Komputerowe w Nauce, Gospodarce i Administracji, POLMAN’99. Poznań,
Ośrodek Wydawnictw Naukowych, 1999, s. 71-87.
187. Stroiński M.,
W ę g l a r
z J., Polskie sieci naukowe a Internet
nowej generacji INTERNET’99. Materiały konferencyjne, Wrocław, Oficyna
Wydawnicza Politechniki Wrocławskiej, 1999, s. 36-42.
188.
W ę g l a r z J a n (ed.), Project Scheduling: Recent
Models, Algorithms and Applications. Boston, Kluwer, 1999.
ISBN 0-7923-82684.
189.
Błażewicz J., Formanowicz
P., Kasprzak M., Markiewicz
W.T., W ę g l a r z J., Tabu search for
DNA sequencing with false negatives and false positives, “Europ.
J. Opnl. Res.”, 2000, vol.
125, pp. 257-265.
190.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z
J., A performance analysis of a simulated annealing algorithm for the
project scheduling problem. Proc. of the
6th International Conference Methods and Models in Automation and
Robotics, Międzyzdroje 2000, pp. 865-870.
191.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., A heuristic approach to allocating the
continuous resource in tabu search for discrete-continuous scheduling problems, Proc. of the International Conference
Methods and Models in Automation and Robotics, Międzyzdroje
2000, pp. 871-876.
192. Józefowska
J., Mika M., Różycki R., Waligóra G., W ę g l a r
z J., Algorytm symulowanego wyżarzania
dla problemu rozdziału zasobów z wieloma sposobami wykonywania czynności. „Zeszyty
Naukowe Politechniki Śląskiej”, 2000, seria: Automatyka, z. 129, s. 211-220.
193. Józefowska
J., Mika M., Różycki R., Waligóra G., W ę g l a r
z J., Rozwiązywanie dyskretno-ciągłych
problemów rozdziału zasobów przez dyskretyzację zasobu ciągłego. „Zeszyty
Naukowe Politechniki Śląskiej”, 2000, seria:
Automatyka, z. 129, s. 221-229.
194.
Józefowska J., Mika M., Różycki R., Waligóra G., W ę g l a r z J., On a discrete transformation of the discrete-continuous project scheduling problem. Proc. of the
PMS, Osnabrück 2000, pp. 171-173.
195.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., Solving the multi-mode resource-contrained project scheduling problem by simulated annealing. Proc. of the PMS, Osnabrück 2000, pp. 174-176.
196.
Józefowska J.,Waligóra G.,
W ę g l a r z J., Heuristic continuous
resource allocation in discrete-continuous scheduling problems to minimize the makespan. Proc. of the ECCO XIII, Capri 2000, pp.
189-191.
197.
Mazurek C., Stroiński
M., W ę g l a r z J., Architecture for
distance education based on optical Internet in Poland. Proc. of the European University Information Systems – EUNIS 2000
Congress “Towards Virtual
Universities”, April 13-14, 2000, Poznań, pp. 235-242.
198.
Meyer N., Stroiński
M., W ę g l a r z J., Optical network
for euro-regional co-operation. Proc. of
the Polish-German Symposium on Science, Research, Education, SRE’ 2000, Zielona Góra 28-29. 09, 2000, pp.
143-146.
199.
Nabrzyski J., Stroiński
M., W ę g l a r z J., Networking aspects
of distributed and parallel computing. In: J. Błażewicz,
K. Ecker, B. Plateau, D. Trystram,
Handbook on Parallel and Distributed Processing. Berlin, Springer Verlag, 2000, pp. 410-463. ISBN 3-540-664416.
200. Nabrzyski J., Starzak S., Stroiński
M., W ę g l a r z J., European multicolour network – a point of
view of the polish NREN. Materiały konferencyjne ISThmus 2000.
Poznań 2000, pp. 31-37.
201.
Rychlewski J., Stroiński M., Starzak S., W ę g l a r z J., PIONIER – optical
Internet for Poland. Proc. ISThmus 2000 Conference – Research and Development for the
Information Society, April 11-13, 2000, Poznań,
pp. 19-29.
202. Mazurek C.,
Stroiński M., W ę g l a r z J., Współczesne technologie, usługi i
aplikacje sieciowe. „Prace Instytutu Geodezji i Kartografii”, 2000, t. 47, z.
101, s. 29-37.
203.
Józefowska J., Mika M., Różycki R., Waligóra G., W ę g l a r z J., Solving discrete-continuous project scheduling problem via its discretization, “Mathematical Methods of Operations Research”, Special Issue on
Project Scheduling, 2000 vol.52, no.
3, pp .489-499.
204.
Binczewski A., Meyer
N., Nabrzyski J., Starzak S., Stroiński M., W ę g l
a r z. J., First experiences with the Polish Optical Internet, “Computer
Networks”, 2001 vol. 37, no. 2 pp. 747-759.
205. Binczewski A.,
Stroiński M., W ę g l a r z J., Sieć nowej generacji dla elektronicznej Europy, Materiały z Konferencji PIONIER
2001, Poznań 2001, s. 371-382.
206.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., Simulated annealing for multi-mode
resource-constrained project scheduling, “Annals of Operations Research”, 2001
vol.102, pp.137-155.
207.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., On preemptive Cmax scheduling
of dependent tasks on parallel identical machines. Proc. 7th IEEE International Symposium
on Methods and Models in Automation and Robotics, Międzyzdroje
2001, pp. 485-488.
208.
Józefowska J., Różycki R.,
Waligóra G., W
ę g l a r z J., Solving discrete-continuous scheduling problems by tabu search, Proc. of
the 4th Metaheuristic International Conference, MIC 2001, Porto, 2001, pp. 667-671.
209.
Mika M., Nabrzyski
J., Waligóra G., W ę g l a r z J., A simulated annealing algorithm for a scheduling problem in grid
environments, Proc. of the 7th IEEE
International Symposium on Methods
and Models in Automation and Robotics MMAR 2001, Międzyzdroje,
28-31.08.2001, pp. 479-484.
210.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., A heuristic approach to allocating the
continuous resource in discrete-continuous scheduling problems to minimize the makespan, “Journal of Scheduling”, 2002 vol. 5, iss., 6, pp. 487-499.
211.
Józefowska J., Mika M., Waligóra
G., W ę g l a r z J., Multi-mode resource-constrained project
scheduling problem with discounted positive cash flows simulated annealing vs. tabu-search, “Foundations
of Computing and Decision Sciences”, 2002 vol. 27, no. 2, pp. 97-114.
212.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., An optimal procedure for the preemptive Cmax
scheduling of dependent tasks on parallel identical machines. Proc. of the 9th
International Workshop on Project Management and Scheduling, Valencia,
Spain 2002, pp. 213-216.
213. Józefowska
J., Mika M., Różycki R., Waligóra G., W ę g l a r
z J., Maksymalizacja zaktualizowanej
wartości netto w problemach rozdziału zasobów – przegląd modeli i algorytmów. „Zeszyty Naukowe Politechniki Śląskiej”, 2002
seria: Automatyka, z. 134, s. 243-254.
214. Józefowska
J., Mika M., Różycki R., Waligóra G., W ę g l a r
z J., Maksymalizacja zaktualizowanej
wartości netto w problemach rozdziału zasobów z wieloma sposobami wykonywania
czynności. „Zeszyty Naukowe
Politechniki Śląskiej”, 2002 seria: Automatyka, z. 134, s. 255-264.
215.
Józefowska J., Waligóra
G., W ę g l a r z J., Properties of
discrete-continuous schedules with minimum flow time, Proc. of the 8th IEEE International Conference on Methods and Models in
Automation and Robotics MMAR 2002, Szczecin 2002, pp. 1085-1090.
216.
Józefowska J., Waligóra
G., W ę g l a r z J., Tabu list management methods for a discrete-continuous
scheduling problem, “Europ. J. Opnl.
Res.”, 2002, vol. 137, no. 2, pp. 288-302.
217.
Józefowska J., W ę g l a r z J., New results for discrete-continuous mean
flow time scheduling problems. Proc. of the 9th International
Workshop on Project Management and Scheduling, Valencia, Spain, 2002, pp. 217-220.
218. Kleiber M., W
ę g l a r z J.,
Polski Internet Optyczny jako wkład w budowę Społeczeństwa Informacyjnego,
Materiały konferencji PIONIER 2002, Poznań, OWN PAN, 2002 s. 11-23.
219.
Rychlewski J., Stroiński
M., W ę g l a r z J., Polish Optical Internet programme for eScience. Proc. of the 4th Global Research Village
Conference, Warszawa, 2002, pp. 27-41.
220.
Józefowska J., Różycki R.,
W ę g l a r z J., Uncertainty in discrete-continuous project scheduling. Z. Banaszak and J. Józefowska (eds.),
Project Driven Manufacturing, Warszawa, WNT 2003, pp. 23-33. ISBN 83-204-289-9.
221.
Józefowska J., Waligóra
G., W ę g l a r z J., A performance analysis of tabu search for discrete-continuous scheduling problems. In:
Metaheuristics: Computer Decision-Making, M.G.C
Resende, J.P. de Sousa (red.), Kluwer
Academic Publishers, 2003, pp. 385-404.
222.
Józefowska J., Waligóra
G., W ę g l a r z J., Probabilistic tabu search for makespan
minimization discrete-continuous scheduling, “Foundations of Computing and Decision Sciences”, 2003,
vol. 28, no. 4, pp. 211-222.
223.
Kurowski K., Nabrzyski J.,
Olesiak A., W ę
g l a r z, J., Multicriteria aspects of grid resource management. In: Grid Resource Management:
State of the Art and Future Trends, J. Nabrzyski,
J.M. Schopf, J. Węglarz (eds.).
Kluwer Academic Publishers, 2003, pp. 271-293. ISBN
978-140-207575-9.
224.
Mika M., Waligóra
G., W ę g l a r z J., A metaheuristics approach to scheduling workflow jobs on a
grid, In: Grid Resource Management:
State of the Art and Future Trends, J. Nabrzyski,
J.M. Schopf, J. W ę g l a r z (eds.). Kluwer Academic Publishers, 2003, pp. 295-318. ISBN
978-140-207575-9.
225.
Mika M., Waligóra
G., W ę g l a r z J., Metaheuristic approach to the multi-mode
resource-constrained project scheduling problem with discounted cash flows and
progress payments. Zbiór referatów Konferencji Naukowo-Technicznej „Automatyzacja
Nowości i Perspektywy” Automation 2003, Warszawa 2-4. 04 2003, PIAP Warszawa, 2003, s. 228-237.
226.
Mika M., Waligóra
G., W ę g l a r z J., The multi-mode resource-constrained
project scheduling problem with discounted cash inflows and a fixed number of
payments, Proc. of the 9th IEEE International Conference on Methods and
Models in Automation and Robotics MMAR 2003, Międzyzdroje, 25-28.08 2003. pp. 1163-1168.
227.
Mika M., Waligóra
G., W ę g l a r z J., The multi-mode
resource-constrained project scheduling problem with schedule-dependent setup
times in grid environments, Proc. of the 9th IEEE International Conference
on Methods in Automation and Robotics MMAR 2003, Międzyzdroje,
25-28.08 2003, pp. 1115-1120.
228.
Nabrzyski J., Schopf J., W
ę g l a r z J., (eds.): Grid Resource
Management: State-of-the Art. and Future Trends. Boston, Kluwer
Academic Publishers, 2003. ISBN 978-140-207575-9.
229.
Józefowska J., W ę g l a r z J., Scheduling with resource
constraints-continuous resources. Chapter 24. In: Joseph Y-T Leung (eds.)
Handbook of Scheduling, Chapman & Hall/CRC 2004, pp. 24.1-24.15. ISBN
978-158-488397-5.
230.
Józefowska J., Mika M., Różycki
R., Waligóra G., W ę g l a r z J., An almost optimal heuristic for preemptive Cmax scheduling of dependent tasks on parallel
identical machines, ”Annals of
Operations Research”, 2004 vol.129, pp. 205-216.
231.
Józefowska J., Różycki R.,
W ę g l a r z J., Discrete-continuous
scheduling problem with machine dependent processing rates. Proc. of the 9th International
Workshop on Project Management and Scheduling, PMS 2004, pp. 226-229.
232.
Mika M., Waligóra
G., W ę g l a r z J., A performance
analysis of tabu search for Project scheduling
problems with discounted cash flows. Proc.
of the 10th IEEE International Conference on Methods and Models in
Automation and Robotics MMAR 2004, pp. 1227-1232.
233.
Mika M., W ę g l a r z J., A simulated annealing algorithm for the
resource leveling problem. Proc. of the
10th IEEE International Conference on Methods and Models in Automation
and Robotics MMAR 2004, pp. 1237-1242.
234.
Mika M., W ę g l a r z J., Heurystyczne algorytmy równoważenia
obciążenia w problemach rozdziału zasobów z wieloma sposobami wykonywania
czynności. Automatyzacja Procesów Dyskretnych. Optymalizacja Dyskretna. Robotyka
i Sterowniki Programowalne. (red.) R. Gessing, T.
Szkodny. WNT, 2004, s. 161-169. ISBN 83-921428-0-2.
235.
W ę g l a r z J., Technologie informacyjne i infrastruktura
informatyczna nauki. „Nauka”, 2004, nr
1, s. 113-123.
236.
W ę g l a r z J., Gateway to the e-World. “Academia”, 2004, nr 3, pp. 7-9.
237.
Błażewicz J., Kovalyov
M.Y., Machowiak M., Trystram
D., J a n W ę g l a r z, Malleable tasks
scheduling to minimize the makespan, Annals of Operations Research, vol. 129,
65-80.
238.
Mika M., Waligóra
G., W ę g l a r z J., Simulated
annealing and tabu searach for
multi-mode resource-constrained Project scheduling with positive disconnted Cash flows and different payment models. “Europ. J. Opnl. Res.”, 2005, vol. 164, no. 3 pp. 639-668.
239.
Józefowska J., W ę g l a r z J. (eds.), Perspectives in Modern Project
Scheduling, Springer 2006, ISBN 978-0-387-33643-5.
240.
Błażewicz J., Ceyda O., Świercz A., W ę g l a r z
J., DNA sequencing by hybridization via genetic search. “Operations
Research”, 2006 vol.54, no. 6, pp.
1185-1192.
241.
Błażewicz J., Kovalyov
M.Y., Machowiak M., Trystam
D, W ę g l a r z J., Preemptable
malleabletask task scheduling problem. “IEEE Trans.
Computers.” 2006 vol. 55, no. 4, pp. 486-490.
242.
Mika M., Waligóra
G., W ę g l a r z J., Modeling setup times in project
scheduling. In: J. Józefowska , J. Węglarz (eds.), Perspectives in Modern Project Scheduling.
Springer, 2006, pp. 131-163. ISBN 978-0-387-33643-5.
243.
Kurowski K., Nabrzyski J., Oleksiak A., W ę g l a r z J., Grid multicriteria job scheduling. In: J. Józefowska , J. Węglarz (eds.),
Perspectives in Modern Project Scheduling. Springer, 2006, pp. 345-375. ISBN
978-0-387-33643-5
244.
Kurowski K., Nabrzyski
J., Oleksiak A., W ę g l a r z
J., Scheduling jobs on the grid multicriteria
approach. “Computational methods in Science and Technology”, 2006 vol. 2, no. 2, pp. 123-139.
245.
Błażewicz J., Ecker K.,
Schmidt G., Pesch E., W ę g l a r z
J., Handbook of Scheduling: from Theory to Applications. Springer, 2007.
ISBN 978-3-540-28046-0.
246.
Kosiedowski M., Mazurek C.,
Stroiński M., W ę g l a r z J., Grid – supported medical digital library.
“Studies in Helth Technology and Informatics”, 2007, vol. 126, no. 2 pp.127-136.
247.
Czyrnek M., Kuśmierek
E., Mazurek C., Stroiński
M., W ę g l a r z J., CDN for live and
on-demand video services over IP. Chapter. 13 , In: Content Delivery Networks. (eds.)
Buyya Rajkumar, Pathan Mukaddim, Vakali Atena. LNEE, Springer
2008, vol.9, pp. 317-342. ISBN 978-3-540-77886-8.
248.
Dudczak A., Mazurek C., Stroiński M., Werla
M., W ę g l a r z
J., Scenariusze wykorzystania usług atomowych rozproszonych bibliotek
cyfrowych. Materiały konferencyjne INFOBAZY 2008 Systemy Aplikacje Usługi.
Sopot 2008, s. 254-259.
249.
Kurowski K., Nabrzyski
J., Oleksiak A., W ę g l a r z J., Multicriteria
approach to two-level hierarchy scheduling in grids. “Journal of Scheduling”,
2008 vol. 11, no. 5, pp. 371-379.
250.
Kurowski K., Nabrzyski J.,
Oleksiak A., Werla M., W ę
g l a r z J., Grid scheduling
simulations with GSSIM. IEEE Proc. of
SRMPDS’07/ICPADS’07, Hsinchu, Tajwan,
2008, pp. 1-8.
251.
Lewandowska A., Mazurek C., Stroiński M., Werla
M., W ę g l a r z
J., Federacja bibliotek cyfrowych w sieci PIONIER. Materiały
konferencyjne INFOBAZY 2008 Systemy Aplikacje Usługi. Sopot 2008, s. 216-221.
252.
Mika M., Waligóra
G., W ę g l a r z J., Tabu search for
multi-mode resource-constrained project scheduling with schedule-dependent
setup times. “Europ.
J. Opnl. Res.”, 2008 vol.187,
no. 3, pp. 1238-1250.
253.
Stroiński M., W ę g l a r z J., Znaczenie e-infrastruktury dla nauki. „Nauka”,
nr 2, 2008, s. 57-95.
254.
Czyrnek M.,
Koczorowski F., Kosiedowski M., Mazurek C., Pawłowski P., Pieklik In.,
Stroiński M., Werla M., W ę g l a r
z J., Services for education
in the metropolitan
research and education network. Proc. 1st International Conference on Computer Supported Education CSEDU
2009, Lisbon, pp. 97-103.
255.
Handschuch L, Lawenda M, Stępniak P, Figlerowicz M, Stroiński M., W ę g l a r z
J., New approach to genomics experiments taking advantage of virtual
laboratory system, “Computational Methods in Science & Technology” , 2009
vol. 15, no. 1, pp. 31-40.
256.
Kosiedowski M., Mazurek C.,
Stroiński M., W ę g l a r z J., Medical digital library services as an
improvement of the teleconsultation system in the
regional health network, International
Conference on eHealth, Telemedicine, and Social
Medicine “eTELEMED
257.
Różycki R., W ę g l a r z J., On job models in power management
problems, ”Bull. Acad. Polon. Sci., Ser. Techn.
Sci.”, 2009, vol. 57, iss. 2, pp. 147-151.
258.
Handschuch
L., Lawenda M., Meyer N., Stępniak
P., Figlerowicz
M., Stroiński M., W ę g l a r z J., Virtual laboratory and its application in
genomics. Chapter 5. In: Remote Instrumentation and Virtual Laboratories. (eds.)
F. Davoli [et al.]. Springer 2010, pp. 43-61. ISBN
978-1-4614-0507-8.
259.
Kurowski K., Oleksiak
A., W ę g l a r z J., Multicriteria, multi-user scheduling in Grids with advance
reservation. “Journal of Scheduling”, 2010
vol. 13, no. 5, pp. 493-508.
260.
Bąk S., Krystek M.,
Kurowski K., Oleksiak A., Piątek W., W ę g l a r z J., GSSIM – a tool for distributed computing
experiments, “Scientific Programming”, 2011
vol. 19, no. 4, pp. 231-351.
261.
Błażewicz M., Brandt S.R., Kierzynka M., Kurowski K., Ludwiczak B., Tao J., W ę g l a r z J., CaKernel - a parallel application programming framework for
heterogenous computing architectures, “Scientific
Programming”, 2011 vol. 19, no. 4, pp.
185-197.
262.
Józefowska J., Mika M., Waligóra
G., W ę g l a r z J., Project scheduling
with finite or infinite number of activity processing modes – a survey, “Europ. J. Opnl. Res.”, 2011 vol. 208, no. 3, pp. 177-205.
263.
Kosiedowski M., Mańkowski
B., Mazurek C., Słowiński K.,
Stroiński M., Szymański K.,
W ę g l a r z J., Teletrauma
procedures and information flow in a regional
telemedical network, “Global Telemedicine and Heath
Updates: Knowledge Resources”, 2011
vol. 4, pp. 37-41.
264.
Kosiedowski M., Mazurek C.,
Słowiński K., Stroiński M.,
W ę g l a r z J., On building a regional
telemedical
network: Wielkopolska Center of Telemedicine
Platform, CICC-ITOE 2011, vol. 2, pp. 354-357.
265.
Kurowski K., Oleksiak
A., Piątek W., W ę g l a r z J., Hierarchical scheduling strategies for
parallel tasks and advance reservations in grids, “Journal of Scheduling”, 2011, 1-20, DOI 10.1007/s10951-011-0254-9.
266.
Mazurek C., Stroiński
M., Werla M., W ę g l a r z J., Distributed services and metadata flow in
The Polish Federation of Digital
Libraries, Proc. International Conference
on Information Society (i-Society) June 27-29, 2011,
London, pp. 39-46. ISBN 978-1-61284-148-9.
267.
Mika M., Piątek
W., Waligóra G., W ę g l a r z J., Computational experiments for scheduling
workflow applications in grid environment. “Computational Methods in Science
and Technology”, 2011 vol. 17, no. 1-2, pp. 53-62.
268.
Mika M., Waligóra
G., W ę g l a r z J., Modelling and solving grid-resource allocation problem with
network resources for workflow applications, “Journal of Scheduling”, 2011 vol.
14, no. 3, pp. 291-306.
269.
Różycki R. W ę g l a r z J., Power-aware scheduling of preemptable jobs on identical parallel processors to
minimize makespan, “Annals of Operations Research”, [online],
8 September 2011, springerlink.com. ISSN 1572-9338
270.
Biały T., Bogdański
M., Brzeziński J., Kobusiński
J., Kosiedowski M., Mazurek
C., Stroiński, W ę g l a r z J., Bridging telemedical
center and hospitals on the example of the Wielkopolska
Center of Telemedicine, Proc.
International Conference on Medical Physics and Engineering, Fizmed 2011. (to appear).
271.
Brzeziński J., Kosiedowski
M., Mazurek C., Słowiński
K., Stroiński M., W ę g l a r z J., Towards telemedical center – digitization of Inter-professional
communication in healthcare. In: Handbook of Research on ICTs for Healthcare
and Social Services.(eds.) M.M. Cruz Cucha, M. Miranda. (to appear).
272.
Mazurek C., Sielski K.,
Stroiński M., Walkowska J.,
Werla M., W ę g l a r z J., Transforming a flat metadata schema to a
semantic Web ontology, The Polish Digital Libraries Federation and CIDOC CRM
Case Study. In: Intelligent tools for building a scientific information
platform. Studies in Computational Intelligence vol. 390 2012. Berlin, Springer,
pp. 153-177. ISBN 978-3-642-24809-2-10
273.
Różycki R., W ę g l a r z J., Power-aware scheduling of preemptable jobs on identical parallel processors to meet
deadlines, “Europ. J. Opnl.
Res.”, 2012 vol. 218, no.1, pp. 68-75